Skip to main content
PT Intan Nusantara Indonesia Home PT Intan Nusantara Indonesia
Quote

Coal Trading and Shipping From Mine to Ship

From Kalimantan mines to ports overseas, with direct work with the mines, clear sales contracts, automatic conveyor loading at river jetties, and loading onto ocean ships in deep water.

10 barge-loading jetties Deep-water offshore anchorages One-time, trial, contract and KSO supply Loads up to 25,000 tons per day onto ships

Buying Directly From Mines or Through Brokers

Working directly with mines removes the risk of dealing with middlemen.

Buyers often meet chains of brokers who claim to own cargo but have no right to buy the coal and no checked stockpile set aside. PT Intan Nusantara Indonesia deals directly with licensed mining companies (IUP-OP and PKP2B permit holders).

Our sourcing team matches mining plans to the coal available at river jetties and to the main ship's loading dates. Every shipment we offer is tied to a specific mine layer, a set amount of road transport, and a checked stockpile lot.

Direct From Mine to Port

The coal is tracked at every step, from the weighbridge at the mine to the conveyor belt at the river.

Checks Before Loading

Independent lab testing before coal is loaded onto river barges.

How We Work With the Mines

1. Matching Coal Layers to the Mining Plan We review monthly mining schedules to find coal layers that match the buyer's energy content and moisture needs.
2. Separate Stockpiles We keep set coal lots apart at river terminals so they do not mix with other suppliers' coal or coal that does not meet the specs.
3. Barge Loading and Inspector Sampling SGS, Sucofindo or Carsurin take automatic samples from the falling coal stream throughout barge loading.
4. Loading the Ship and Weight Check Floating cranes load the ocean ship at offshore anchorages, and a draft survey (measuring how deep the ship sits) certifies the weight (COW).
Supply Options • Comparison

Supply Options Compared

Five supply options, from one-time or trial shipments to multi-year contracts priced against an index.

Option Typical Shipment Size Ship Size Loading Date Notice How Price Is Set Coal Set Aside
One-Time Shipment (Spot) Laycan allocated upon SPA execution and L/C issuance 50,000–75,000 tons per shipment Supramax / Panamax with their own cranes Book 21–30 days ahead FOB / CFR spot index price (ICI 3, ICI 4) or fixed price Stockpile checked quickly before shipping
Trial Shipment available to qualified overseas power company buyers 35,000 – 55,000 MT (Single Vessel) Handymax, or Supramax with its own cranes Book 25–35 days ahead Fixed price, paid at set stages A dedicated check of the coal layer and stockpile
Contract Supply Monthly parcel allocation aligned with mine pit extraction schedule 150,000–500,000 tons per contract period Fixed monthly loading dates Book 30–45 days ahead, rolling Monthly average of the ICI index A guaranteed monthly amount
Long-Term Supply (KSO) open to selecting strategic supply partners 500,000–1,200,000+ tons per year Ongoing ship schedule Yearly plan set 60+ days ahead Formula agreed between both sides, using several indexes, under the Joint Operation Coal layers reserved from specific mines
Buyer-Specific Sourcing made to the buyer's technical specs Custom shipments (50,000+ tons) Matched to your unloading terminal Mixing planned 30 days ahead Price tied to the coal quality Stockpile mixed from several mines
One-Time Shipment (Spot) OPTION 1

One-Time Shipment (Spot)

One shipment with a near-term loading date. Good for power companies covering an unexpected fuel shortage, or buying when spot prices are favorable.

Volume: 50,000–75,000 tons per shipment
Price: FOB / CFR spot index price (ICI 3, ICI 4) or fixed price
Notice: Book 21–30 days ahead
Supramax / Panamax with their own cranes Ask About This
Trial Shipment OPTION 2

Trial Shipment

For new overseas buyers who want to test how the coal works in their boiler, check the independent inspector's results (SGS/Sucofindo), and confirm document clearance before signing a long-term deal.

Volume: 35,000 – 55,000 MT (Single Vessel)
Price: Fixed price, paid at set stages
Notice: Book 25–35 days ahead
Handymax, or Supramax with its own cranes Ask About This
Contract Supply OPTION 3

Contract Supply

A supply agreement over several months or a year, with guaranteed monthly loading slots, so factories and independent power producers can plan their coal stock.

Volume: 150,000–500,000 tons per contract period
Price: Monthly average of the ICI index
Notice: Book 30–45 days ahead, rolling
Fixed monthly loading dates Ask About This
Long-Term Supply (KSO) OPTION 4

Long-Term Supply (KSO)

A multi-year agreement based on a joint mining operation (KSO) and coal reserved at the mine, with no middleman trader.

Volume: 500,000–1,200,000+ tons per year
Price: Formula agreed between both sides, using several indexes, under the Joint Operation
Notice: Yearly plan set 60+ days ahead
Ongoing ship schedule Ask About This
Buyer-Specific Sourcing OPTION 5

Buyer-Specific Sourcing

Coal mixed to meet strict boiler needs, such as sulfur limits, low volatile matter, or a high ash melting temperature (AFT).

Volume: Custom shipments (50,000+ tons)
Price: Price tied to the coal quality
Notice: Mixing planned 30 days ahead
Matched to your unloading terminal Ask About This

Coal Export Process: From Mine to Mother Vessel

Every export shipment moves through seven controlled stages, from open-pit mining and crushing to private haulage, river barge loading, offshore transshipment onto the Mother Vessel, and customs release.

1

Mine extraction and seam control

Open-pit mining and seam profiling

21 partner mines across 22,874 ha in South Kalimantan

Mining crews excavate coal selectively by seam across 21 ESDM MODI verified partner concessions holding IUP-OP and PKP2B permits. Mine geologists log each coal seam and run pit-face sampling under ISO 589 and ASTM standards to check calorific value, moisture, ash, and sulfur before coal leaves the pit.

Quality and Control Checks

Seam profiling, pit-face proximate testing, and ESDM MODI permit checks

2

Stockpile, crushing, and grade segregation

Export sizing and pile management

ROM and jetty stockpiles

Primary and secondary crushers size run-of-mine (ROM) coal down to standard export specification (0 to 50 mm, at least 90% within range). Yard crews stack each calorific band (GAR 3,800 to 6,300 kcal/kg) in separate blocks, compact the piles to restrict airflow, and monitor pile temperatures so coal does not self-heat.

Quality and Control Checks

Crusher sizing checks, thermal camera scans, probe thermometers, and runoff settling ponds

3

Private haul-road trucking

Mine-to-jetty road transport

20 to 80 km private haul roads

Double-trailer haul trucks carrying 80 to 120 MT move sized coal over private, all-weather haul roads directly from the mines to our river jetties, avoiding public highway bottlenecks. Each truck crosses calibrated weighbridges at mine dispatch and jetty arrival.

Quality and Control Checks

Weighbridge tickets, axle load verification, and GPS fleet tracking

4

Jetty barge loading and mechanical sampling

Conveyor and direct hopper loading

12 partner river and coastal jetties

At automated river terminals, extendable conveyor belts load 300 to 330 ft barges at 600 to 1,200 MT per hour. At direct-loading coastal jetties, excavators and hoppers load 230 to 300 ft barges at 100 to 300 MT per hour. Accredited inspectors (SGS, Sucofindo, or Carsurin) draw continuous mechanical samples from the falling coal stream throughout loading.

Quality and Control Checks

Automatic conveyor sampling (ISO 13909 and ASTM D2234), belt scales, and barge draft surveys

5

River and coastal barge transit

Tug-and-barge navigation to offshore anchorages

Barito, Kintap, Satui, and coastal channels

Tugboats tow flat-top steel barges carrying 4,000 to 10,000 MT per set from the river jetties out to the offshore deep-water anchorages. Marine dispatchers time departures to river tides for safe under-keel clearance and track every convoy over AIS and VHF across the 18 to 36 hour passage.

Quality and Control Checks

Tidal window dispatch, channel depth checks, 24/7 AIS/VHF tracking, and barge trim checks

6

Offshore transshipment to the Mother Vessel

Ship's crane or floating crane loading

Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan

At offshore anchorages with 12 to 22 m natural water depth, the Mother Vessel anchors, tenders Notice of Readiness (NOR), clears port authorities, and passes hold cleanliness inspection. After an initial draft survey, coal transfers from barges into the ship's holds either by the vessel's own deck cranes (12,000 to 18,000 MT/day) or by offshore floating cranes with 25 to 35 MT grabs (15,000 to 25,000 MT/day), followed by hold trimming.

Quality and Control Checks

Hold cleanliness inspection, initial and final draft surveys (COW), ballast management, and rain hatch cover control

7

Export customs release and ocean voyage

Documentation settlement and sailing

Indonesian customs to buyer discharge port

Once trimming and the final draft survey finish, the chief officer issues the Mate's Receipt and Indonesian customs grant PEB and NPE export clearance. The independent surveyor issues the binding COA and COW, the carrier releases the Clean On-Board Bill of Lading for Letter of Credit or SWIFT settlement, and the Handymax, Supramax, Panamax, or Capesize vessel sails to the destination port.

Quality and Control Checks

Clean On-Board Bill of Lading, COA and COW issuance, PEB/NPE customs clearance, and cargo hold temperature monitoring

Coal Export Loading Methods

How PT Intan Nusantara Indonesia loads and transfers steam coal by river barge, geared Mother Vessel, or offshore floating crane.

Coal Export Using Barges

Flat-top steel barges carry crushed coal from river jetties to regional discharge terminals or out to offshore anchorages. Buyers use this method directly under FOB Barge contracts or as the river feeder leg for ocean shipments.

When buyers choose this method

Suited to FOB Barge sales, domestic or short-sea coastal buyers with river berths, and every Kalimantan shipment that must move coal from inland mines to deep water.

Step-by-step loading sequence

  1. 01 Mine hauling and stockpile preparation

    Mine haul trucks carrying 80 to 120 MT deliver crushed coal (0 to 50 mm) from the pit to the river jetty yard. Terminal crews stack each calorific grade in its own block, compact the pile to limit internal heating, and run temperature checks before loading begins.

  2. 02 Loading coal onto the barge at the jetty

    At automated river jetties such as PT Talenta Bumi, PT Hasnur Jaya Utama, and PT Tapin Coal Terminal, extendable conveyor belts load 300 to 330 ft barges at 600 to 1,200 MT per hour. At smaller coastal jetties without conveyors, excavators and loading hoppers load 230 to 300 ft barges at 100 to 300 MT per hour.

  3. 03 Mechanical sampling and barge draft survey

    During conveyor loading, an accredited surveyor (SGS, Sucofindo, or Carsurin) takes continuous mechanical samples from the falling coal stream under ISO 13909 and ASTM D2234. Once loading finishes, the surveyor reads the barge draft marks to verify cargo weight and trim stability.

  4. 04 River and coastal towing

    A tugboat tows the loaded barge (4,000 to 10,000 MT per set) down the Barito, Kintap, or coastal waterways. Marine dispatchers time departures to river tides for safe under-keel clearance, and our operations desk tracks every convoy over AIS and VHF throughout the 18 to 36 hour transit.

  5. 05 Unloading at the terminal or mooring for transshipment

    For FOB Barge or direct coastal deliveries, the barge berths at the buyer's receiving jetty or power plant, where shore excavators, clamshell cranes, or unloading hoppers discharge the coal onto conveyors or stockpiles. For ocean exports, the tug moors the barge alongside the anchored Mother Vessel or a floating crane at the offshore anchorage.

Barge hull size
230 to 330 ft

Heavy-duty flat-top steel barges

Cargo per barge set
4,000 to 10,000 MT

Single tug and barge convoy

Jetty loading speed
600 to 1,200 MT/hr

Conveyor; 100 to 300 MT/hr direct

Common trade terms
FOB Barge / Feeder

Direct delivery or anchorage leg

Export methods side by side

Operational capacity and equipment across barge delivery, ship-crane loading, and floating-crane transshipment.

Confirm Loading Method
Export method Vessel or hull class Loading gear Loading rate Parcel size Best suited for
Barges 230 to 330 ft flat-top barges Jetty conveyor or excavator and hopper 600 to 1,200 MT/hr (conveyor) 4,000 to 10,000 MT per set FOB Barge contracts, river delivery, or feeding Mother Vessels
Mother Vessel (Ship's Crane) Geared Handymax, Supramax, Ultramax 4 x 30 MT ship cranes (10 to 12 m³ grabs) 12,000 to 18,000 MT/day 40,000 to 65,000 MT FOB Vessel or CFR/CIF shipments on geared bulk carriers
Mother Vessel + Floating Crane Gearless Panamax, Capesize, or Supramax 1 or 2 offshore floating cranes (25 to 35 MT grabs) 15,000 to 25,000 MT/day 55,000 to 150,000+ MT Large gearless bulkers and fast laycan turnaround offshore

How We Manage River Stockpiles

Our terminal crews separate coal by calorific band, compact stacks to cut airflow, and monitor core temperatures so energy content and moisture stay within contract limits before barge loading.

See Testing Procedures

Grade separation

Isolated yard blocks (GAR 3,800 to 6,300 kcal/kg)

Terminal crews stack each calorific band (Low 3,800 to 4,200, Mid 4,500 to 5,000, High 5,800 to 6,300 kcal/kg) in its own marked yard block so grades do not mix.

Spontaneous combustion control

Compaction, thermal scans, and FIFO dispatch

Bulldozers compact each stack to cut internal airflow. Yard crews check piles with thermal cameras and probe thermometers to catch hot spots early, and we load the oldest lots first on a first-in, first-out schedule.

Dust and water runoff

Perimeter sprayers and multi-stage settling ponds

Automated perimeter water sprayers suppress airborne coal dust across the yard. Graded stockpile pads channel rainwater runoff into multi-stage settling and neutralizing ponds.

Working yard capacity

50,000 to 250,000 MT per terminal

Each partner river terminal holds 50,000 to 250,000 metric tons of working inventory. Live stock levels shift with the monthly mining schedule.

River Facilities • South Kalimantan Network

Jetty Barge Ports and Loading Details

Twelve river jetties load 300 ft and 330 ft barges along Kalimantan waterways, using automatic conveyors or machine loaders.

Jetty How It Loads Loading Speed Barge Sizes It Handles River Depth Limit Area Stockpile Size
PT TALENTA BUMI Automatic conveyor belt 800–1,000 tons per hour 300ft / 330ft (7.5k – 10k DWT) About 5.0–6.5 m (depends on the tide) Barito River area, South Kalimantan 120,000 – 180,000 MT
PT HASNUR JAYA UTAMA Automated Conveyor Belt 800 – 1,000 MT/Hr 300ft / 330ft (7.5k – 10k DWT) Approx. 5.0m – 6.5m (Tidal Window) Barito River entrance, South Kalimantan 150,000 – 200,000 MT
PT TAPIN COAL TERMINAL Fast automatic conveyor 800 – 1,200 MT/Hr 300ft / 330ft (7.5k – 10k DWT) Approx. 5.5m – 6.5m (Tidal Window) Tapin area, South Kalimantan 200,000 – 250,000 MT
CV CITRA Continuous conveyor 600 – 800 MT/Hr 250ft / 300ft (5k – 7.5k DWT) About 4.5–5.5 m (river depth) South Kalimantan area 80,000 – 120,000 MT
PT PELABUHAN SWANGI INDAH Loaded directly by excavator and hopper 200 – 300 MT/Hr 250ft / 300ft (5k – 7.5k DWT) About 4.5–5.5 m (coastal jetty) Tanah Bumbu coast 60,000 – 90,000 MT
PT PELABUHAN INDONESIA IV Automated Conveyor Belt 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m State-owned commercial port 100,000 – 150,000 MT
PT DUTA TUJUH BERSAUDAR SEJATI Automated Conveyor Belt 600 – 800 MT/Hr 250ft / 300ft (5k – 7.5k DWT) Approx. 4.5m – 5.5m South Kalimantan Basin 70,000 – 100,000 MT
PT MANDIRI CITRA BERSAMA Conveyor loading 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m South Kalimantan Basin 90,000 – 130,000 MT
PT SAIJAAN PRIMA COAL Loaded directly by machine 100 – 200 MT/Hr 230ft / 250ft (4k – 5.5k DWT) Approx. 4.0m – 5.0m Kotabaru coast 50,000 – 80,000 MT
JETTY MANURUNG Direct Mechanical Loading 100 – 200 MT/Hr 230ft / 250ft (4k – 5.5k DWT) Approx. 4.0m – 5.0m South Kalimantan Basin 50,000 – 75,000 MT
JETTY KSO ASAM ASAM Automated Conveyor Belt 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m Asam Asam, South Kalimantan 80,000 – 120,000 MT
JETTY IMCM Automated Conveyor Belt 600 – 800 MT/Hr 300ft (7.5k DWT) Approx. 5.0m – 6.0m South Kalimantan Basin 80,000 – 120,000 MT
Offshore Loading • South & East Kalimantan

Loading Anchorages and Locations

Deep-water offshore anchorages that PT Intan Nusantara Indonesia uses for ocean ship bookings, floating crane loading and certified draft surveys.

Anchorage 1 • TABONEO

TABONEO ANCHORAGE

S 03° 41' 57.95" - E 114° 27' 31.13

Main loading hub in South Kalimantan, with direct open-sea access for large floating cranes and loading of bulk ships.

Natural Water Depth: 14.0–18.0 m (deep open sea)
Ship Types Handymax, Supramax, Ultramax, Panamax
Loading Equipment: Large floating cranes (25–35 ton grabs)
Daily Loading: 15,000–22,000 tons per day
South Kalimantan river mouth / Java Sea entrance Open for loading dates
Anchorage 2 • ASAM ASAM

ASAM ASAM ANCHORAGE

3°57'56"S 115°7'36"E

Offshore loading point for mines in south-eastern Kalimantan, with shorter barge trips.

Natural Water Depth: 12.0–16.0 m (deep coastal water)
Ship Types Handymax, Supramax & Geared Panamax
Loading Equipment: Ship's own cranes with grabs, or floating crane
Daily Loading: 12,000 – 18,000 MT/Day
Tanah Laut / Asam Asam area Open for loading dates
Anchorage 3 • MUARA SATUI

MUARA SATUI ANCHORAGE

S 03° 57' 53.18" - E 115° 32' 47.21

Loading anchorage that takes coal from the Satui and Tanah Bumbu mining areas.

Natural Water Depth: 14.0–17.5 m (deep offshore)
Ship Types Supramax & Panamax Bulkers
Loading Equipment: Large floating cranes and barge fleets
Daily Loading: 15,000 – 20,000 MT/Day
Satui coast, Tanah Bumbu Open for loading dates
Anchorage 4 • TANJUNG PEMANCINGAN

TANJUNG PEMANCINGAN ANCHORAGE

S 03° 12' 37.29" - E 116° 16' 59.36"

A deep natural anchorage sheltered by Laut Island, which keeps loading conditions steady all year, even in monsoon swells.

Natural Water Depth: 16.0–22.0 m (sheltered deep channel)
Ship Types Panamax and Capesize
Loading Equipment: Two floating cranes / deep-water loading
Daily Loading: 18,000 – 25,000 MT/Day
Kotabaru / Laut Island channel Open for loading dates

Which Ships Fit Which Anchorage

Which ship types can load here, and what cranes they need, across the main bulk ship categories.

Ship Type Carrying Capacity (DWT) Maximum Depth in Water Cranes Typical Loading Time Anchorages That Fit
Handymax 40,000 – 50,000 DWT Approx. 11.5m – 12.0m With own cranes (4 × 30-ton) or without, using a floating crane 2.5 – 3.5 Days Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan
Supramax / Ultramax 50,000 – 65,000 DWT Approx. 12.5m – 13.5m With own cranes and grabs (10–12 cubic meters) preferred; floating crane can be used easily 3.0 – 4.5 Days All anchorages (Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan)
Panamax / Post-Panamax 70,000 – 85,000 DWT Approx. 14.0m – 15.0m Usually without own cranes; loaded by large floating cranes 4.0 – 6.0 Days Taboneo, Muara Satui, and Tanjung Pemancingan (deep channel)
Capesize 150,000+ DWT Approx. 17.5m – 19.0m Without own cranes; loaded by several floating cranes 8.0 – 10.0 Days Tanjung Pemancingan (sheltered deep channel)
Ship Charter Matching • Shipping Procedures

Naming Your Ship and Setting Loading Dates

Standard steps for naming the ship, giving notice that it is ready (NOR), and loading, designed to reduce the risk of late-loading penalties (demurrage).

STEP 1

Name Your Ship (21–30 days ahead)

The buyer sends the ship's details: name, IMO number, flag, year built, width and length, carrying capacity, hatch layout, crane capacity (the Q88 form), and the shipping agent.

STEP 2

We Accept the Ship and Narrow the Loading Dates

PT-INI checks the ship's size against the anchorage depth and floating crane clearance. The standard 10-day loading window is narrowed to 5 days at 15 days before arrival, and to a firm 3-day window 7 days before the ship's expected arrival (ETA).

STEP 3

Arrival Time Updates (10 / 7 / 5 / 3 / 2 / 1 days before)

The ship's captain sends the updated expected arrival time (ETA) to the port agent and the PT-INI operations team at set times: 10, 7, 5, 3 and 2 days, and 24 hours before reaching the anchorage pilot station.

STEP 4

Ready Notice (NOR) and Cargo Hold Inspection

When the ship anchors at the set location, it gives its ready notice (NOR, in forms such as WIPON/WIBON/WIFPON). Port health (Karantina Kesehatan), Immigration, Customs and an independent inspector check that the cargo holds are clean, dry and free of leftover cargo.

STEP 5

Loading and First Draft Survey

An independent inspector (SGS/Sucofindo) does the first draft survey before loading starts. Floating crane loading then runs non-stop, while the ship's balance and ballast water release are managed.

STEP 6

Final Draft Survey and Shipping Papers

When loading and leveling are finished, the final draft survey sets the certified weight in tons (Certificate of Weight, COW). The captain signs the Mate's Receipt, and the Clean On-Board Bill of Lading and export permits (PEB/NPE) are issued.

Shipping Documents We Provide

Clean On-Board Ocean Bill of Lading (B/L) Vessel Master / Ocean Carrier Agent

A transferable ownership document confirming the cargo is loaded in the ship's holds.

Mate's Receipt Issued by the ship's chief officer

An immediate confirmation of what was loaded, how much, and in what condition.

Certificate of Weight (COW) Issued by a certified independent inspector (SGS/Sucofindo)

Weight in tons confirmed by a draft survey of the ship.

Statement of Facts (SOF) Issued by the port agent and captain

A time-ordered log of the ready notice, loading time, weather and work shifts.

Certificate of Cargo Hold Cleanliness Issued by an independent marine inspector

Confirms the holds were dry, clean and ready to take steam coal.

Cargo Loading Plan and Leveling Declaration Issued by the ship's chief officer

How the weight is spread across each hold, to keep the ship safe and stable.

Kalimantan River Barges and Deep-Water Loading

Ready to Book Loading Dates or Arrange Barges?

Arrange tugboats and barges on the river, draft surveys, and floating crane loading onto ocean ships at the Taboneo, Asam Asam, Muara Satui, or Tanjung Pemancingan anchorages.

Taboneo, Asam Asam, Muara Satui & Tanjung Pemancingan
Crane loading of 15,000 to 22,000 tons per day
Daily Statement of Facts (SOF) tracking
Indonesian customs export clearance (PEB and NPE)
Anchorage slots open for the 2026 season Active

Our shipping team replies within 24 working hours.