Coal Trading and Shipping From Mine to Ship
From Kalimantan mines to ports overseas, with direct work with the mines, clear sales contracts, automatic conveyor loading at river jetties, and loading onto ocean ships in deep water.
Buying Directly From Mines or Through Brokers
Working directly with mines removes the risk of dealing with middlemen.
Buyers often meet chains of brokers who claim to own cargo but have no right to buy the coal and no checked stockpile set aside. PT Intan Nusantara Indonesia deals directly with licensed mining companies (IUP-OP and PKP2B permit holders).
Our sourcing team matches mining plans to the coal available at river jetties and to the main ship's loading dates. Every shipment we offer is tied to a specific mine layer, a set amount of road transport, and a checked stockpile lot.
The coal is tracked at every step, from the weighbridge at the mine to the conveyor belt at the river.
Independent lab testing before coal is loaded onto river barges.
How We Work With the Mines
Supply Options Compared
Five supply options, from one-time or trial shipments to multi-year contracts priced against an index.
| Option | Typical Shipment Size | Ship Size | Loading Date Notice | How Price Is Set | Coal Set Aside |
|---|---|---|---|---|---|
| One-Time Shipment (Spot) Laycan allocated upon SPA execution and L/C issuance | 50,000–75,000 tons per shipment | Supramax / Panamax with their own cranes | Book 21–30 days ahead | FOB / CFR spot index price (ICI 3, ICI 4) or fixed price | Stockpile checked quickly before shipping |
| Trial Shipment available to qualified overseas power company buyers | 35,000 – 55,000 MT (Single Vessel) | Handymax, or Supramax with its own cranes | Book 25–35 days ahead | Fixed price, paid at set stages | A dedicated check of the coal layer and stockpile |
| Contract Supply Monthly parcel allocation aligned with mine pit extraction schedule | 150,000–500,000 tons per contract period | Fixed monthly loading dates | Book 30–45 days ahead, rolling | Monthly average of the ICI index | A guaranteed monthly amount |
| Long-Term Supply (KSO) open to selecting strategic supply partners | 500,000–1,200,000+ tons per year | Ongoing ship schedule | Yearly plan set 60+ days ahead | Formula agreed between both sides, using several indexes, under the Joint Operation | Coal layers reserved from specific mines |
| Buyer-Specific Sourcing made to the buyer's technical specs | Custom shipments (50,000+ tons) | Matched to your unloading terminal | Mixing planned 30 days ahead | Price tied to the coal quality | Stockpile mixed from several mines |
One-Time Shipment (Spot)
One shipment with a near-term loading date. Good for power companies covering an unexpected fuel shortage, or buying when spot prices are favorable.
Trial Shipment
For new overseas buyers who want to test how the coal works in their boiler, check the independent inspector's results (SGS/Sucofindo), and confirm document clearance before signing a long-term deal.
Contract Supply
A supply agreement over several months or a year, with guaranteed monthly loading slots, so factories and independent power producers can plan their coal stock.
Long-Term Supply (KSO)
A multi-year agreement based on a joint mining operation (KSO) and coal reserved at the mine, with no middleman trader.
Buyer-Specific Sourcing
Coal mixed to meet strict boiler needs, such as sulfur limits, low volatile matter, or a high ash melting temperature (AFT).
Coal Export Process: From Mine to Mother Vessel
Every export shipment moves through seven controlled stages, from open-pit mining and crushing to private haulage, river barge loading, offshore transshipment onto the Mother Vessel, and customs release.
Mine extraction and seam control
Open-pit mining and seam profiling
21 partner mines across 22,874 ha in South KalimantanMining crews excavate coal selectively by seam across 21 ESDM MODI verified partner concessions holding IUP-OP and PKP2B permits. Mine geologists log each coal seam and run pit-face sampling under ISO 589 and ASTM standards to check calorific value, moisture, ash, and sulfur before coal leaves the pit.
Seam profiling, pit-face proximate testing, and ESDM MODI permit checks
Stockpile, crushing, and grade segregation
Export sizing and pile management
ROM and jetty stockpilesPrimary and secondary crushers size run-of-mine (ROM) coal down to standard export specification (0 to 50 mm, at least 90% within range). Yard crews stack each calorific band (GAR 3,800 to 6,300 kcal/kg) in separate blocks, compact the piles to restrict airflow, and monitor pile temperatures so coal does not self-heat.
Crusher sizing checks, thermal camera scans, probe thermometers, and runoff settling ponds
Private haul-road trucking
Mine-to-jetty road transport
20 to 80 km private haul roadsDouble-trailer haul trucks carrying 80 to 120 MT move sized coal over private, all-weather haul roads directly from the mines to our river jetties, avoiding public highway bottlenecks. Each truck crosses calibrated weighbridges at mine dispatch and jetty arrival.
Weighbridge tickets, axle load verification, and GPS fleet tracking
Jetty barge loading and mechanical sampling
Conveyor and direct hopper loading
12 partner river and coastal jettiesAt automated river terminals, extendable conveyor belts load 300 to 330 ft barges at 600 to 1,200 MT per hour. At direct-loading coastal jetties, excavators and hoppers load 230 to 300 ft barges at 100 to 300 MT per hour. Accredited inspectors (SGS, Sucofindo, or Carsurin) draw continuous mechanical samples from the falling coal stream throughout loading.
Automatic conveyor sampling (ISO 13909 and ASTM D2234), belt scales, and barge draft surveys
River and coastal barge transit
Tug-and-barge navigation to offshore anchorages
Barito, Kintap, Satui, and coastal channelsTugboats tow flat-top steel barges carrying 4,000 to 10,000 MT per set from the river jetties out to the offshore deep-water anchorages. Marine dispatchers time departures to river tides for safe under-keel clearance and track every convoy over AIS and VHF across the 18 to 36 hour passage.
Tidal window dispatch, channel depth checks, 24/7 AIS/VHF tracking, and barge trim checks
Offshore transshipment to the Mother Vessel
Ship's crane or floating crane loading
Taboneo, Asam Asam, Muara Satui, Tanjung PemancinganAt offshore anchorages with 12 to 22 m natural water depth, the Mother Vessel anchors, tenders Notice of Readiness (NOR), clears port authorities, and passes hold cleanliness inspection. After an initial draft survey, coal transfers from barges into the ship's holds either by the vessel's own deck cranes (12,000 to 18,000 MT/day) or by offshore floating cranes with 25 to 35 MT grabs (15,000 to 25,000 MT/day), followed by hold trimming.
Hold cleanliness inspection, initial and final draft surveys (COW), ballast management, and rain hatch cover control
Export customs release and ocean voyage
Documentation settlement and sailing
Indonesian customs to buyer discharge portOnce trimming and the final draft survey finish, the chief officer issues the Mate's Receipt and Indonesian customs grant PEB and NPE export clearance. The independent surveyor issues the binding COA and COW, the carrier releases the Clean On-Board Bill of Lading for Letter of Credit or SWIFT settlement, and the Handymax, Supramax, Panamax, or Capesize vessel sails to the destination port.
Clean On-Board Bill of Lading, COA and COW issuance, PEB/NPE customs clearance, and cargo hold temperature monitoring
Coal Export Loading Methods
How PT Intan Nusantara Indonesia loads and transfers steam coal by river barge, geared Mother Vessel, or offshore floating crane.
Coal Export Using Barges
Flat-top steel barges carry crushed coal from river jetties to regional discharge terminals or out to offshore anchorages. Buyers use this method directly under FOB Barge contracts or as the river feeder leg for ocean shipments.
Suited to FOB Barge sales, domestic or short-sea coastal buyers with river berths, and every Kalimantan shipment that must move coal from inland mines to deep water.
Step-by-step loading sequence
- 01 Mine hauling and stockpile preparation
Mine haul trucks carrying 80 to 120 MT deliver crushed coal (0 to 50 mm) from the pit to the river jetty yard. Terminal crews stack each calorific grade in its own block, compact the pile to limit internal heating, and run temperature checks before loading begins.
- 02 Loading coal onto the barge at the jetty
At automated river jetties such as PT Talenta Bumi, PT Hasnur Jaya Utama, and PT Tapin Coal Terminal, extendable conveyor belts load 300 to 330 ft barges at 600 to 1,200 MT per hour. At smaller coastal jetties without conveyors, excavators and loading hoppers load 230 to 300 ft barges at 100 to 300 MT per hour.
- 03 Mechanical sampling and barge draft survey
During conveyor loading, an accredited surveyor (SGS, Sucofindo, or Carsurin) takes continuous mechanical samples from the falling coal stream under ISO 13909 and ASTM D2234. Once loading finishes, the surveyor reads the barge draft marks to verify cargo weight and trim stability.
- 04 River and coastal towing
A tugboat tows the loaded barge (4,000 to 10,000 MT per set) down the Barito, Kintap, or coastal waterways. Marine dispatchers time departures to river tides for safe under-keel clearance, and our operations desk tracks every convoy over AIS and VHF throughout the 18 to 36 hour transit.
- 05 Unloading at the terminal or mooring for transshipment
For FOB Barge or direct coastal deliveries, the barge berths at the buyer's receiving jetty or power plant, where shore excavators, clamshell cranes, or unloading hoppers discharge the coal onto conveyors or stockpiles. For ocean exports, the tug moors the barge alongside the anchored Mother Vessel or a floating crane at the offshore anchorage.
- Barge hull size
- 230 to 330 ft
- Cargo per barge set
- 4,000 to 10,000 MT
- Jetty loading speed
- 600 to 1,200 MT/hr
- Common trade terms
- FOB Barge / Feeder
Heavy-duty flat-top steel barges
Single tug and barge convoy
Conveyor; 100 to 300 MT/hr direct
Direct delivery or anchorage leg
Coal Export Using a Mother Vessel (Ship's Crane)
Geared bulk carriers anchor in deep water offshore and load coal directly from barges moored alongside using their own deck cranes and clamshell grabs. This method avoids external floating crane charter fees when vessel gear meets the contract loading rate.
Standard for geared Handymax (40,000 to 50,000 DWT), Supramax, and Ultramax (50,000 to 65,000 DWT) vessels calling at Taboneo, Asam Asam, Muara Satui, or Tanjung Pemancingan.
Step-by-step loading sequence
- 01 Anchorage arrival, NOR, and hold clearance
The geared Mother Vessel drops anchor at the assigned offshore roadstead (12 to 18 m natural depth) and tenders Notice of Readiness (NOR). Port health, immigration, and customs clear the ship, and an independent marine surveyor inspects every cargo hold to confirm it is clean, dry, and free of prior residue.
- 02 Initial draft survey and barge mooring
Before the first grab lifts, an accredited surveyor (SGS, Sucofindo, or Carsurin) measures the ship's initial draft to establish empty displacement. Tugs bring loaded river barges alongside the vessel's port and starboard hulls, securing them with marine fenders and mooring lines to match the chief officer's stowage plan.
- 03 Direct loading with the vessel's deck cranes
Stevedore teams operate the ship's onboard cranes (typically four 30-ton cranes fitted with 10 to 12 cubic meter grabs) simultaneously. Cranes lift coal from the open barges and swing it into the cargo holds in a planned sequence while the crew discharges ballast water to keep hull stress and trim within safe limits.
- 04 Cargo trimming and hold completion
As each hold approaches target tonnage, stevedores and compact payloaders level the coal surface inside the hold so the cargo stays stable during ocean swells. Hatch covers close immediately if rain squalls pass over the anchorage to protect moisture limits.
- 05 Final draft survey and export release
After all holds are trimmed, the surveyor performs the final draft survey to issue the binding Certificate of Weight (COW), paired with the Certificate of Analysis (COA). The vessel master signs the Mate's Receipt, Indonesian customs issue PEB and NPE release, and the carrier issues the Clean On-Board Bill of Lading.
- Vessel classes
- Handymax to Ultramax
- Onboard lifting gear
- 4 x 30 MT cranes
- Daily loading rate
- 12,000 to 18,000 MT/day
- Typical loading time
- 2.5 to 4.5 days
40,000 to 65,000 DWT geared
10 to 12 m³ clamshell grabs
Weather working day basis
Depends on parcel size and weather
Coal Export Using a Mother Vessel and Floating Crane
One or two heavy-lift floating cranes moor alongside the Mother Vessel offshore to transfer coal from river barges into the ship's holds. This setup is required for gearless Panamax and Capesize bulkers and speeds up turnaround for larger export parcels.
Required for gearless Panamax (70,000 to 85,000 DWT) and Capesize (150,000+ DWT) vessels, and chosen for Supramax shipments that need faster daily loading rates to avoid demurrage.
Step-by-step loading sequence
- 01 Deep-water anchoring and floating crane positioning
The Mother Vessel anchors in 14 to 22 m of natural water depth at Taboneo, Muara Satui, or the sheltered channel at Tanjung Pemancingan. Once NOR, customs clearance, hold inspection, and the initial draft survey are complete, tugs maneuver one or two floating cranes alongside the ship and secure them against heavy pneumatic fenders.
- 02 Barge marshalling and continuous feed
Tugs moor loaded 300 to 330 ft coal barges on the outboard side of the floating crane, placing the crane between the barge and the Mother Vessel's holds. A queued fleet of waiting barges rotates in as each hull empties so loading continues with minimal idle time.
- 03 High-capacity grab transfer and conveyor reach
Floating crane operators lift coal with 25 to 35 ton clamshell grabs and discharge it into the ship's holds, either directly or through an onboard hopper and slewing conveyor boom that reaches across wide Panamax and Capesize beams. Single or dual cranes sustain 15,000 to 25,000 MT per day across continuous shifts while the vessel crew manages de-ballasting.
- 04 Hold trimming, moisture protection, and final survey
Stevedores trim each hold to the chief officer's stability plan as loading finishes, closing hatches during rain. The independent surveyor then completes the final draft survey to certify total loaded tonnage on the Certificate of Weight (COW) and finalizes the Certificate of Analysis (COA).
- 05 Customs clearance and ocean departure
With the Mate's Receipt signed, Indonesian customs issue PEB and NPE export clearance and the carrier releases the Clean On-Board Bill of Lading. The floating crane casts off and the Mother Vessel sails to the buyer's discharge port.
- Vessel classes
- Supramax to Capesize
- Floating crane gear
- 25 to 35 MT grabs
- Daily loading rate
- 15,000 to 25,000 MT/day
- Typical loading time
- 3.0 to 10.0 days
Geared or gearless bulk carriers
Single or dual crane setups
Continuous shift transshipment
Panamax 4 to 6 days; Capesize 8 to 10
Export methods side by side
Operational capacity and equipment across barge delivery, ship-crane loading, and floating-crane transshipment.
| Export method | Vessel or hull class | Loading gear | Loading rate | Parcel size | Best suited for |
|---|---|---|---|---|---|
| Barges | 230 to 330 ft flat-top barges | Jetty conveyor or excavator and hopper | 600 to 1,200 MT/hr (conveyor) | 4,000 to 10,000 MT per set | FOB Barge contracts, river delivery, or feeding Mother Vessels |
| Mother Vessel (Ship's Crane) | Geared Handymax, Supramax, Ultramax | 4 x 30 MT ship cranes (10 to 12 m³ grabs) | 12,000 to 18,000 MT/day | 40,000 to 65,000 MT | FOB Vessel or CFR/CIF shipments on geared bulk carriers |
| Mother Vessel + Floating Crane | Gearless Panamax, Capesize, or Supramax | 1 or 2 offshore floating cranes (25 to 35 MT grabs) | 15,000 to 25,000 MT/day | 55,000 to 150,000+ MT | Large gearless bulkers and fast laycan turnaround offshore |
How We Manage River Stockpiles
Our terminal crews separate coal by calorific band, compact stacks to cut airflow, and monitor core temperatures so energy content and moisture stay within contract limits before barge loading.
Grade separation
Isolated yard blocks (GAR 3,800 to 6,300 kcal/kg)
Terminal crews stack each calorific band (Low 3,800 to 4,200, Mid 4,500 to 5,000, High 5,800 to 6,300 kcal/kg) in its own marked yard block so grades do not mix.
Spontaneous combustion control
Compaction, thermal scans, and FIFO dispatch
Bulldozers compact each stack to cut internal airflow. Yard crews check piles with thermal cameras and probe thermometers to catch hot spots early, and we load the oldest lots first on a first-in, first-out schedule.
Dust and water runoff
Perimeter sprayers and multi-stage settling ponds
Automated perimeter water sprayers suppress airborne coal dust across the yard. Graded stockpile pads channel rainwater runoff into multi-stage settling and neutralizing ponds.
Working yard capacity
50,000 to 250,000 MT per terminal
Each partner river terminal holds 50,000 to 250,000 metric tons of working inventory. Live stock levels shift with the monthly mining schedule.
Jetty Barge Ports and Loading Details
Twelve river jetties load 300 ft and 330 ft barges along Kalimantan waterways, using automatic conveyors or machine loaders.
| Jetty | How It Loads | Loading Speed | Barge Sizes It Handles | River Depth Limit | Area | Stockpile Size |
|---|---|---|---|---|---|---|
| PT TALENTA BUMI | Automatic conveyor belt | 800–1,000 tons per hour | 300ft / 330ft (7.5k – 10k DWT) | About 5.0–6.5 m (depends on the tide) | Barito River area, South Kalimantan | 120,000 – 180,000 MT |
| PT HASNUR JAYA UTAMA | Automated Conveyor Belt | 800 – 1,000 MT/Hr | 300ft / 330ft (7.5k – 10k DWT) | Approx. 5.0m – 6.5m (Tidal Window) | Barito River entrance, South Kalimantan | 150,000 – 200,000 MT |
| PT TAPIN COAL TERMINAL | Fast automatic conveyor | 800 – 1,200 MT/Hr | 300ft / 330ft (7.5k – 10k DWT) | Approx. 5.5m – 6.5m (Tidal Window) | Tapin area, South Kalimantan | 200,000 – 250,000 MT |
| CV CITRA | Continuous conveyor | 600 – 800 MT/Hr | 250ft / 300ft (5k – 7.5k DWT) | About 4.5–5.5 m (river depth) | South Kalimantan area | 80,000 – 120,000 MT |
| PT PELABUHAN SWANGI INDAH | Loaded directly by excavator and hopper | 200 – 300 MT/Hr | 250ft / 300ft (5k – 7.5k DWT) | About 4.5–5.5 m (coastal jetty) | Tanah Bumbu coast | 60,000 – 90,000 MT |
| PT PELABUHAN INDONESIA IV | Automated Conveyor Belt | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | State-owned commercial port | 100,000 – 150,000 MT |
| PT DUTA TUJUH BERSAUDAR SEJATI | Automated Conveyor Belt | 600 – 800 MT/Hr | 250ft / 300ft (5k – 7.5k DWT) | Approx. 4.5m – 5.5m | South Kalimantan Basin | 70,000 – 100,000 MT |
| PT MANDIRI CITRA BERSAMA | Conveyor loading | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | South Kalimantan Basin | 90,000 – 130,000 MT |
| PT SAIJAAN PRIMA COAL | Loaded directly by machine | 100 – 200 MT/Hr | 230ft / 250ft (4k – 5.5k DWT) | Approx. 4.0m – 5.0m | Kotabaru coast | 50,000 – 80,000 MT |
| JETTY MANURUNG | Direct Mechanical Loading | 100 – 200 MT/Hr | 230ft / 250ft (4k – 5.5k DWT) | Approx. 4.0m – 5.0m | South Kalimantan Basin | 50,000 – 75,000 MT |
| JETTY KSO ASAM ASAM | Automated Conveyor Belt | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | Asam Asam, South Kalimantan | 80,000 – 120,000 MT |
| JETTY IMCM | Automated Conveyor Belt | 600 – 800 MT/Hr | 300ft (7.5k DWT) | Approx. 5.0m – 6.0m | South Kalimantan Basin | 80,000 – 120,000 MT |
Loading Anchorages and Locations
Deep-water offshore anchorages that PT Intan Nusantara Indonesia uses for ocean ship bookings, floating crane loading and certified draft surveys.
Main loading hub in South Kalimantan, with direct open-sea access for large floating cranes and loading of bulk ships.
Offshore loading point for mines in south-eastern Kalimantan, with shorter barge trips.
Loading anchorage that takes coal from the Satui and Tanah Bumbu mining areas.
A deep natural anchorage sheltered by Laut Island, which keeps loading conditions steady all year, even in monsoon swells.
Which Ships Fit Which Anchorage
Which ship types can load here, and what cranes they need, across the main bulk ship categories.
| Ship Type | Carrying Capacity (DWT) | Maximum Depth in Water | Cranes | Typical Loading Time | Anchorages That Fit |
|---|---|---|---|---|---|
| Handymax | 40,000 – 50,000 DWT | Approx. 11.5m – 12.0m | With own cranes (4 × 30-ton) or without, using a floating crane | 2.5 – 3.5 Days | Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan |
| Supramax / Ultramax | 50,000 – 65,000 DWT | Approx. 12.5m – 13.5m | With own cranes and grabs (10–12 cubic meters) preferred; floating crane can be used easily | 3.0 – 4.5 Days | All anchorages (Taboneo, Asam Asam, Muara Satui, Tanjung Pemancingan) |
| Panamax / Post-Panamax | 70,000 – 85,000 DWT | Approx. 14.0m – 15.0m | Usually without own cranes; loaded by large floating cranes | 4.0 – 6.0 Days | Taboneo, Muara Satui, and Tanjung Pemancingan (deep channel) |
| Capesize | 150,000+ DWT | Approx. 17.5m – 19.0m | Without own cranes; loaded by several floating cranes | 8.0 – 10.0 Days | Tanjung Pemancingan (sheltered deep channel) |
Naming Your Ship and Setting Loading Dates
Standard steps for naming the ship, giving notice that it is ready (NOR), and loading, designed to reduce the risk of late-loading penalties (demurrage).
Name Your Ship (21–30 days ahead)
The buyer sends the ship's details: name, IMO number, flag, year built, width and length, carrying capacity, hatch layout, crane capacity (the Q88 form), and the shipping agent.
We Accept the Ship and Narrow the Loading Dates
PT-INI checks the ship's size against the anchorage depth and floating crane clearance. The standard 10-day loading window is narrowed to 5 days at 15 days before arrival, and to a firm 3-day window 7 days before the ship's expected arrival (ETA).
Arrival Time Updates (10 / 7 / 5 / 3 / 2 / 1 days before)
The ship's captain sends the updated expected arrival time (ETA) to the port agent and the PT-INI operations team at set times: 10, 7, 5, 3 and 2 days, and 24 hours before reaching the anchorage pilot station.
Ready Notice (NOR) and Cargo Hold Inspection
When the ship anchors at the set location, it gives its ready notice (NOR, in forms such as WIPON/WIBON/WIFPON). Port health (Karantina Kesehatan), Immigration, Customs and an independent inspector check that the cargo holds are clean, dry and free of leftover cargo.
Loading and First Draft Survey
An independent inspector (SGS/Sucofindo) does the first draft survey before loading starts. Floating crane loading then runs non-stop, while the ship's balance and ballast water release are managed.
Final Draft Survey and Shipping Papers
When loading and leveling are finished, the final draft survey sets the certified weight in tons (Certificate of Weight, COW). The captain signs the Mate's Receipt, and the Clean On-Board Bill of Lading and export permits (PEB/NPE) are issued.
Shipping Documents We Provide
A transferable ownership document confirming the cargo is loaded in the ship's holds.
An immediate confirmation of what was loaded, how much, and in what condition.
Weight in tons confirmed by a draft survey of the ship.
A time-ordered log of the ready notice, loading time, weather and work shifts.
Confirms the holds were dry, clean and ready to take steam coal.
How the weight is spread across each hold, to keep the ship safe and stable.
Ready to Book Loading Dates or Arrange Barges?
Arrange tugboats and barges on the river, draft surveys, and floating crane loading onto ocean ships at the Taboneo, Asam Asam, Muara Satui, or Tanjung Pemancingan anchorages.
Our shipping team replies within 24 working hours.